Bridgestone Plant

Project Location:  Wilson, NC
Project Features:  Concrete Division
Flatwork, Site Utilities, Earthwork
Completion Date: 
The project ran in different phases as required for the project, first the demolitions and site utilities, then the mixer area, and last the Carbon Black area. The Mixer Area include foundation installed on top of ground improvement systems, the mixer foundation was considered a mass pour due to the 5’ depth. Elevated slabs required to install shoring to pour the elevated decks. The mixer pit had a Penatron water proof additive and the Slabs on grade, elevated slabs, and slabs on metal decking had steel fiber and shake hardener.