(function(i,s,o,g,r,a,m){i['GoogleAnalyticsObject']=r;i[r]=i[r]||function(){ (i[r].q=i[r].q||[]).push(arguments)},i[r].l=1*new Date();a=s.createElement(o), m=s.getElementsByTagName(o)[0];a.async=1;a.src=g;m.parentNode.insertBefore(a,m) })(window,document,'script','//www.google-analytics.com/analytics.js','ga'); ga('create', 'UA-57279409-2', 'auto'); ga('send', 'pageview');
 

Pratt Industries New Paper Mill

Project Location:  Shreveport, LA
Project Features:  20,000 Cubic Yards of Cast in Place Concrete
1,500 Tons of Reinforcing Steel
Six Month Construction Duration
Completion Date:  October, 2008

The 20,000 cubic yards of cast in place concrete consisted of a 600 foot long elevated machine table, process tanks, process equipment and machine foundations. The demanding schedule for this project required every yard of concrete to be in place in a remarkable six month construction duration.