Dow Kokam - Midland Battery Park

Dow Kokam - Midland Battery Park

Project Location:  Midland, MI
Project Features:  20,450 Cubic Yards of Concrete
405,000 Square Feet of Slab on Grade
80,000 Square Feet of Concrete Slab on Metal Deck
12,400 Lineal Feet of Concrete Curb & Gutter
Complete Building Foundations & Site Concrete
Placed and Finished 150,000 Square Feet of Insulated Concrete Tilt Wall Panel
Completion Date:  October, 2011

Fessler & Bowman, Inc. completed the 405,000 square feet of slab on grade using two Somero Laser Screeds to complete all of the large slab placements. This project presented some unique challenges as the entire slab on grade was placed directly on a 60 mil HDPE liner while utilizing a concrete mix with a low water cement ratio of .40 to achieve the low vapor transmission that this project required.