Tire Rack Distribution Center

Tire Rack Distribution Center

Project Location:  Shreveport, LA
Project Features:  12,300 Cubic Yards of Concrete
257,000 Square Feet of Interior Slab on Grade
181,000 Square Feet of Concrete Pavement
88,000 Square Feet of Concrete Tilt Wall Panel
Complete Concrete Building Foundations & Site Concrete
Completion Date:  December, 2011

The Tire Rack Distribution Center was a 257,000 square foot new build slab on grade construction and tilt wall panel construction building. The tilt wall panels weighed 90,000 pounds each and were formed, poured and erected in less than a one month span.